TenneT on the execution design of Moldau high-voltage pylons
Together with Iv-Consult and WSP, Fortan is realizing the execution design of new Moldau high-voltage pylons for the line from Rilland (Zeeland) to Tilburg (Brabant). This connection is also known as the Zuid-West 380 kV Oost.
The electricity produced at sea off Zeeland is connected to the national grid via the new high-voltage connection.
With the arrival of this line, Zeeland will be connected to the national grid in two ways, which will provide Brabant and Zeeland with a more reliable high-voltage grid.
Contact Us
Are you interested in our services or company, please do not hesitate to contact us via phone or email
Phone: +31 481 – 37 65 43
Email: info@fortan-arnhem.nl